What I would like to do is split the pipe at the junction between the two house supplies, and install 2 meters, but I doubt whether the water authority would agree to coming down the lane to read them.
Posted By: barge17From their site:
1. Installation of AMR meters in each
individual unit
Where AMR meters are installed internally in each
individual unit, they will be installed in the concentric
meter adaptor fitted by the developer directly above
the internal stop tap.
This is a Southern water page:
http://www.southernwater.co.uk/at-home/your-water/water-meters/your-meter-reading/your-amr-meter.asp
Posted By: renewablejohnJust be careful with UU. There very likely to allow two meters up at the property but will insist that your liable for the supply from the mains meter to the properties. ie addition of 2 property meters should equal the main meter. We had this problem turns out our lovely neighbors either side had tapped into our mains supply. UU insisted each put there own feed pipe direct into the main (over 400mtrs) with separate meters.
Posted By: barge17Thanks again for helpful replies. So, renewableJohn, have I got it right that now you have three individual meters at the properties and one at the start of your main?
Also, does that mean the 3 of you have separate accounts at UU ?
I assume that one of you is still responsible for leaks on the main, so does that mean UU are happy to regularly read all 4 meters? I don't suppose AMR meters can be installed underground near a public road.