Posted By: owlmanHas anyone extended, or is planning to extend their usual 4kW PV system to 10kW?
Posted By: jamesingrami think 'fits' is only for grid tied installationNo, though it's a lot easier in practice if you're grid-tied because of this problem with DC metering. The FiT scheme is misnamed in that it's actually a generation tariff scheme with a small feed-in (export) scheme bolted on the side.
Posted By: owlmanYou can still get the generation part of FIT for non grid connected, I think.
Would that not help with costs? There was some talk of problems with generation metering of off grid systems, so AFAIK you'd have to invert and revert?? for battery use.
Posted By: owlmanHave you seen these David?
http://www.sma.de/en/products/battery-inverters.html" >http://www.sma.de/en/products/battery-inverters.html
Posted By: Ed Davies
What I wonder is how much of such a system would have to be MCS approved. Just the PV, inverter and meter or would the inverter-charger and batteries and wiring in between be needed as well?
Posted By: jamesingramAnyone know the latest on the rate drop . looks like they've delayed it
Posted By: richardelliotI submitted my application on 23rd December to EDF and haven't heard anything back yet (not really surprising given the holidays). I'm desperately hoping there aren't any problems with the paperwork as it will be a costly mistake if there are!
Posted By: owlmanI've just received G59 approval to extend to 10kW. I've got until the 15th to decide and fit it.