Posted By: gustyturbinemy roof is around 12mtrs long and is one flat surface with usual pitch
Posted By: SteamyTeaas you are limited to 4 kWp (actually 16A per phase).
Posted By: Ed DaviesHave a device (of the sort Skyewright is thinking of) which limits your export to the required level by diverting any excess to a suitable load.
Posted By: SteamyTeaAsk the installer to leave a couple of extra metres of rail (say it is for solar thermal), then add some modules when they have gone and the scaffolding is still up.
Posted By: djhI'm not sure what the current rules are, but the problem with trying to use an inverter to limit the power was that it wasn't approved for such, and the system size was based on the panel ratings anyway (though I think that part was for FIT purposes).I'm pretty sure there are some properly done installations with more than 4 kW of PV which limit using the inverter which are quite acceptable to the DNO. As you say, it used to be a problem for FiT purposes but that's a) a separate matter and b) history (I think).
Posted By: djh
I don't think that's what skyewright was thinking of. I think he was implying an EMMA, or similar product if there are now some approved.
Posted By: SteamyTeaAs far as I know, the maximum power of a PV system is set by the modules and governed bu the FiT/MCS rules.
Larger systems can be fitted with approval from the DNO, but that is done on an individual basis and generally after a survey.
Posted By: jamesingram
I've not registered my extra 2.2kW with FITS mainly because I've been to busy