Posted By: ItsBobbins1) insulated slab
we have around 500mm void beneath the floor. i understand we would need to build the level up with hardcore then something like sand > DPM > PIR insulation > concrete > Screed > finished floor?
Would there be any issues with this method given the depth of the void?
2) PIR insulation between joists
The joists are only 50mm and most people suggest 100mm PIR. Could extra timbers be fixed to the joists at the counter batten points so allow for 100mm insulation?
Posted By: PetlynThis arrangement does not then require ventilation to the exterior.
Posted By: PetlynWe were allowed to fill our cavity below our suspended floors fully and the whole is included within our envelope -