Home  5  Books  5  GBEzine  5  News  5  HelpDesk  5  Register  5  GreenBuilding.co.uk
Not signed in (Sign In)

Categories



Green Building Bible, Fourth Edition
Green Building Bible, fourth edition (both books)
These two books are the perfect starting place to help you get to grips with one of the most vitally important aspects of our society - our homes and living environment.

PLEASE NOTE: A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book.

Buy individually or both books together. Delivery is free!


powered by Surfing Waves




Vanilla 1.0.3 is a product of Lussumo. More Information: Documentation, Community Support.

Welcome to new Forum Visitors
Join the forum now and benefit from discussions with thousands of other green building fans and discounts on Green Building Press publications: Apply now.




  1.  
    Hi all,

    W’ve now removed the boiler and I’m repairing the botched wall that was glued back together with expanding foam. All the loose fibre insulation in the area has left the building when they knocked the more than foot square hole through to fit the tiny flue.

    I’ve bricked up the outside and now wondering how best to insulate the cavity - we are doing EWI, but with what I’ve read, feel we should fill the cavity.

    The complication is that the adjacent wall looks to also have lost its insulation above this level. It has a window that will be blocked up at some point in the near future and that will also need the same consideration, so using loose stuff now will probably be pointless.

    Also, we have some windows and a door to block up and our wall builder guy has said to use thermalite blocks on the inside of cavity and solid blocks for the outside skin with ‘wall log’ in between. Is this ok or can we better it and could I use this ‘wall log’ or alternative in the boiler hole repair?

    Thanks in advance,
    Denys
    •  
      CommentAuthordjh
    • CommentTimeJul 13th 2023 edited
     
    What is ‘wall log’?
  2.  
    Posted By: djhWhat is ‘wall log’?

    I think he’s referring to fibre type insulation that’s specifically for putting in the cavity during wall construction. I did Google wall log insulation and I just get loads of websites talking about insulating log cabins.

    Any advice on what the best thing to buy for the job would be appreciated.
    • CommentAuthorphiledge
    • CommentTimeJul 13th 2023
     
    My guess would be he means wall lag??
  3.  
    If you are EWI the house then I can't see why thermalite blocks on the inside would be necessary? some people don't like them because the plaster tends to crack. i.e. dense blocks for building a wall, insulation for insulating. Don't try and do both with one material. Does the wall guy know that you are going to EWi? Come to think of it, how thick will the EWI be? 200? 300? Some advocate filling the cavity with concrete if all the insulation is on the outside.
  4.  
    Posted By: Dominic CooneyDoes the wall guy know that you are going to EWi?

    Yes

    Posted By: Dominic CooneyCome to think of it, how thick will the EWI be? 200? 300? Some advocate filling the cavity with concrete if all the insulation is on the outside.


    150mm
  5.  
    An update on what we’re planning to do, any advice appreciated.

    There is a large wood lintel inside and a steel angle iron outside supporting the bricks over the window - we are planning to leave these in place, blocking up to them, to make the window half the size it currently is.

    We’re going to open the cavity and use isover 36 100mm cavity insulation in the 100mm cavity (we have loose fill fibre cavity insulation that I am planning on keeping in place with this stuff as we remove the bridging masonry)

    We’ll block up half the window opening with 100mm solid concrete block on both skins and full fill the cavity. Should we remove the vertical DPM that is there or leave it and same for horizontal DPM that sits under the steel?

    Should we be adding a new DPM to the new window reveal created? - We’re planning on replacing the remaining half of the window soon (it’s two windows fastened together currently) but placing it outside the outer wall so it sits in the EWI - currently researching the materials to do this properly. I saw a video that mentioned that vertical DPM around a window may be a problem for moving the window out. Not sure what to do to make this not a problem. Any ideas also welcomed.
  6.  
    Window pic
      IMG_0824.jpeg
  7.  
    It’s a big window
      IMG_0825.jpeg
    • CommentAuthortony
    • CommentTimeJul 31st 2023
     
    Where the window will be removed you can remove the vertical dpc.

    EWI plan sounds OK, the more insulation value that you can get the better.

    I agree dense blocks for the outside skin

    I would go medium density for inside skin.

    While you are in this mess how about removing the window board and the reveal to the other half of the window and doing cavity insulation properly, removing any thermal bridging.

    Wet plastering is best for internal finish

    Check wall insulation joins seamlessly with loft insulation.

    Nice job!
  8.  
    Posted By: tonyWhere the window will be removed you can remove the vertical dpc.

    EWI plan sounds OK, the more insulation value that you can get the better.

    I agree dense blocks for the outside skin

    I would go medium density for inside skin.

    While you are in this mess how about removing the window board and the reveal to the other half of the window and doing cavity insulation properly, removing any thermal bridging.

    Wet plastering is best for internal finish

    Check wall insulation joins seamlessly with loft insulation.

    Nice job!


    Thanks, we’re doing 150mm EWI and have decided to take off fascia’s etc so we can join to new loft insulation - full plan TBC as per what we find when we strip back.

    Yes, we were planning to strip back the reveals, saw a video today that suggested that but mentioned there may be a structural element - to be honest, we’re shocked at how poor the walls/window opening has been done, so I think we can only improve it!

    Cheers for comments :bigsmile:
    • CommentAuthortony
    • CommentTimeAug 1st 2023
     
    Brilliant! You just stepped up from be ing an apprentice to being the real thing!