Green Building Bible, Fourth Edition |
![]() |
These two books are the perfect starting place to help you get to grips with one of the most vitally important aspects of our society - our homes and living environment. PLEASE NOTE: A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book. |
Vanilla 1.0.3 is a product of Lussumo. More Information: Documentation, Community Support.
Posted By: Tomasz_PHi all,
I could have carried on my other IWI thread but I think it is more helpful to start a new one. As a reminder I am renovating a 17/18C red brick coach house.
I think I am going to go with cork for my IWI. Probably 40-80mm. I am getting different recommendations from different suppliers/fitters.
I have one long wall upstairs where the bare masonry is painted. Not too thick but it won't be in a breathable paint. The wall probably makes up about 30pc of the total outside walls for the second floor. The plasterer said it would be best if I removed this before fitting the cork (which has to be fully bonded to the walls). What is everyone's opinion on this? Is emulsion paint really that impervious? I have just had a quote for £850 blast a few beams. Don't fancy another 850 or more to do this wall. Downstairs I will be doing it in one painted wall but the walls down there are much more damp.
It actually has me questioning the whole idea of breathable iwi and lime plaster because currently the outside of the house is painted in a modern paint and it is going to be a long while before I embark on the job of stripping and re-finishing that.
Posted By: Tomasz_PThanks for all of your info on the products. We are detached and have a bit of land so at least clean up would be easier. The brick isn't in great condition.
@Kristeva you are right. I have to make compromises somewhere. My wife would certainly agree with that. I think it is less important on this second floor.
There is a combination of things causing the damp I believe.
1. Higher ground level outside
2. Poorly maintained French drain - soon to be rectified
3. Cement based floor covering - being rectified as I type
4. Internal cement render and gypsum plaster on ground floor - now mostly removed
Posted By: Tomasz_PHi Kristeva,
I have taken it all up. It is being replaced with a limecrete slab over Glapor. It has been a massive job!
1 to 10 of 10