Home  5  Books  5  GBEzine  5  News  5  HelpDesk  5  Register  5  GreenBuilding.co.uk
Not signed in (Sign In)

Categories



Green Building Bible, Fourth Edition
Green Building Bible, fourth edition (both books)
These two books are the perfect starting place to help you get to grips with one of the most vitally important aspects of our society - our homes and living environment.

PLEASE NOTE: A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book.

Buy individually or both books together. Delivery is free!


powered by Surfing Waves




Vanilla 1.0.3 is a product of Lussumo. More Information: Documentation, Community Support.

Welcome to new Forum Visitors
Join the forum now and benefit from discussions with thousands of other green building fans and discounts on Green Building Press publications: Apply now.




    •  
      CommentAuthorSteamyTea
    • CommentTimeAug 11th 2014
     
    I wonder if this will put my electricity bill up?

    http://www.ft.com/cms/s/0/4d5c670e-212f-11e4-b96e-00144feabdc0.html
    •  
      CommentAuthorfostertom
    • CommentTimeAug 11th 2014
     
    Needs FT subscription - can you copy/paste?
    • CommentAuthorShevek
    • CommentTimeAug 11th 2014 edited
     
    Going through google search and clicking on FT link will get you past their pay wall:
    https://www.google.co.uk/search?q=edf+shuts+four+nuclear+reactors&ie=UTF-8&oe=UTF-8&hl=en-gb&client=safari
    • CommentAuthorTriassic
    • CommentTimeAug 11th 2014
     
    The National Grid said the shut-downs would have no effect on the UK's supply of electricity which it said was "fine", helped by low seasonal demand at this time of year.
    • CommentAuthorborpin
    • CommentTimeAug 11th 2014
     
    Posted By: TriassicThe National Grid said the shut-downs would have no effect on the UK's supply of electricity which it said was "fine", helped by low seasonal demand at this time of year.
    Well that stops the panic, but they said at least 8 weeks for inspection and then repair time. Takes us into a potential cold spot.

    Are these the only 4 of this design?
  1.  
    Well if national grid says it'll have no effect perhaps we dont need them on at all :bigsmile:
  2.  
    Well if national grid says it'll have no effect perhaps we dont need them on at all
  3.  
    EDF go stick your nuclear power where 'the sun dont shine'
    :middlefinger:
    •  
      CommentAuthorSteamyTea
    • CommentTimeAug 13th 2014
     
    Posted By: borpinAre these the only 4 of this design?
    Similar design and age I think.


    Posted By: jamesingramWell if national grid says it'll have no effect perhaps we dont need them on at all
    EDF go stick your nuclear power where 'the sun dont shine'

    Not needed during the summer, but neither are many coal, gas, hydro, wind and solar installations. :cool:
    •  
      CommentAuthorfostertom
    • CommentTimeAug 13th 2014
     
    Perhaps we all ought to get practicing/getting used to shortages, before the hammer drops.
  4.  
    'Where the sun dont shine' ie the winter uk :cry:
    •  
      CommentAuthorSteamyTea
    • CommentTimeAug 13th 2014
     
    :bigsmile:
    Not like me to miss one like that, maybe I have had too much sun today.
Add your comments

    Username Password
  • Format comments as
 
   
The Ecobuilding Buzz
Site Map    |   Home    |   View Cart    |   Pressroom   |   Business   |   Links   
Logout    

© Green Building Press