Home  5  Books  5  GBEzine  5  News  5  HelpDesk  5  Register  5  GreenBuilding.co.uk
Not signed in (Sign In)

Categories



Green Building Bible, Fourth Edition
Green Building Bible, fourth edition (both books)
These two books are the perfect starting place to help you get to grips with one of the most vitally important aspects of our society - our homes and living environment.

PLEASE NOTE: A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book.

Buy individually or both books together. Delivery is free!


powered by Surfing Waves




Vanilla 1.0.3 is a product of Lussumo. More Information: Documentation, Community Support.

Welcome to new Forum Visitors
Join the forum now and benefit from discussions with thousands of other green building fans and discounts on Green Building Press publications: Apply now.




  1.  
    Dear Illustrious community,

    Nearing completeion of our beautiful small strawbale /timber building. I have two main questions I'd much appreciate help with:-
    1) 5 years ago we obtained pp for two buildings on our 1 acre site - a house and a studio. We have spent that 5 years building the smaller of the 2 buildings, the studio. As far as we were aware there was no difference between the purpose and therefore standards of build/design/regs for them both. The building far exceeds regs for thermal performance and those connected with energy efficiency. Our long time buidling inspector left the company and we have been passed on to someone else. Somehow the building has been given the epithet of "outbuilding" along the way to distinguish it from the larger building which, it was presumed, would be our dwelling. As I say, we have never considered it as anything other than a dwelling. We will not now build the bigger building as we are ragged, exhausted and poor now. Are there any problems with this building being considered our home that anyone can see and if so, what are the main differences in requirements between the two categories as far as building regs are concerned. Of course it has never been considered an outbuilding as far as building regs have gone - witness the endless posts here by me over the years!
    2) We are desperate to move in so as not to face a 5th winter in a caravan in an exhausted state. Please would someone clarify to me the problem with moving in before we officially get it signed off (we have not built with a mortgage.) Is it just an issue of Building Regs. company not wanting to be held accountable for any possible problems? More importantly, is there a way around this? I'm having great trouble identifying what constitutes readiness to be "signed off". Any clarification much appreciated!
    Carol
    •  
      CommentAuthornigel
    • CommentTimeOct 18th 2011
     
    You need to check the planning status of your building. As I understand it your building is an ancillary domestic building which you cannot use as a separate domestic dwelling. Given that you have not built the main one its difficult to see how it is ancillary. I would therefore check with the planning department that what you are doing is ok. They may ask you to apply for modified planning consent.

    As regards building regs, depending on the use that you originally stated on the application, there would be different regulations that apply to what is now a dwelling as opposed to an outbuilding. I would refer to building control and as them to approve the building for use as a dwelling. Your original application should state its intended use and the basis upon which they have been checking it.
    • CommentAuthordickster
    • CommentTimeOct 18th 2011
     
    move in quick
    • CommentAuthorfinny
    • CommentTimeOct 18th 2011
     
    As above...and plant leylandii all around double quick
    • CommentAuthorfinny
    • CommentTimeOct 18th 2011
     
    Oh and what company did your building inspector leave?:confused:
    • CommentAuthorDarylP
    • CommentTimeOct 18th 2011
     
    ... do you 'need' a Completion Cert?
    Move in, and keep quiet!
    If you do not plan to sell or remortgage, then don't worry about BC sign-off....

    I have clients as we speak who have moved in, and have no final date for BC to attend the site for final inspection, prior to sign-off.

    Why did you not use the LA Building Control guy/gal?... just interested...?

    Good luck.... :smile:
    • CommentAuthorCWatters
    • CommentTimeOct 19th 2011
     
    How would forum members suggest Carol handle the issue of council tax ? Postal address ?

    If you want it to be all legal and above board you will probably need to get the planning permission amended but that might not be difficult given you want to build less than you currently have permission for.

    There is no reason why you can't move in without Building Control approval but best aim to get it done. There should be no reason why you cant get a completion cert for the building. Final inspection should only be a formality if you've done everything right.

    I suppose if there were an accident that wouldn't have happened had you got Building Control Approval then the insurance co might try to reduce your claim on the grounds you were negligent.
Add your comments

    Username Password
  • Format comments as
 
   
The Ecobuilding Buzz
Site Map    |   Home    |   View Cart    |   Pressroom   |   Business   |   Links   
Logout    

© Green Building Press