Home  5  Books  5  GBEzine  5  News  5  HelpDesk  5  Register  5  GreenBuilding.co.uk
Not signed in (Sign In)

Categories



Green Building Bible, Fourth Edition
Green Building Bible, fourth edition (both books)
These two books are the perfect starting place to help you get to grips with one of the most vitally important aspects of our society - our homes and living environment.

PLEASE NOTE: A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book.

Buy individually or both books together. Delivery is free!


powered by Surfing Waves




Vanilla 1.0.3 is a product of Lussumo. More Information: Documentation, Community Support.

Welcome to new Forum Visitors
Join the forum now and benefit from discussions with thousands of other green building fans and discounts on Green Building Press publications: Apply now.




    • CommentAuthorMike George
    • CommentTimeApr 19th 2007 edited
     
    Hi all, I am working on some figures for a publication and I want to check that my understanding of conversion rates is correct.

    Here goes:
    Part L1 states guidance figures of 10m3/m2/hr @50Pa for new housing
    [whole building volume] [m3] per m2 of external fabric [in contact with outside air] per hour @ 50Pa

    The software I am using works on values inputted in ach [air changes per hour] @ 0Pa

    Converting the requirement to air changes per hour is buiding specific
    As a simple example 1ach for a building 200m3 with a surface area of 100m3 would be 200/100 = 2m3/m2/hr @ 0Pa
    To convert to values at 50Pa multipy x 20 = 40m3/m2/hr

    Therefore in order to comply with Part L1 this example would require a maximum air infiltration rate of 0.25ach

    Is this correct? In particular the rule of thumb figure of 20 to convert from 0Pa to 50Pa?
    • CommentAuthorGuest
    • CommentTimeApr 19th 2007
     
    From Paul T,

    Hi, I am performing Air tightness tests and SAP work now.

    you are correct on the calcs.

    Unfortunately PArt L1, SAP and ATTMA (the air tightness guys) have got in a mess!

    We should all be using the internationaly accepted copnvention - air changes per hour. - [Whole building air change rate][m3] per [Volume][m3] per hour @ 50Pa
    (Permeability is just an average performance indicator of the building envelope)

    The rule of thumb to convert to normal operation (4 Pa average assumed) is 1/20. If however you want tto get the real value use:
    1/10 for a sheltered site
    1/20 for 'average'
    1/30 for exposed

    Imagine this for a block of flats. Regulations use 1/20. The basement flat will be half this and the top floor + 50%.

    How significant are these errors?
    For a 60m2 square flat, 2.4 m high the difference between the surface area and Volume will be 40% This means a building with n50 =14 ach could pass the regulations (Permeability, q50=10). For a high rise flat then use the 1/10 rule. the heat loss due to infiltration will then be 180% greater than assumed in SAP! (even for the closest that SAP gets, a basement, it is still out by 33%). Typicaly ventialtion heat loss is around 30-40% for a new build
    As government predictions are for 60% of new homes to be flats it negates all of the Part L improvements in 2006!
  1.  
    To scale up from background ach/hr to the air ach/hr @ 50pa you multiply the background ach/hr by 20, to the best of my knowledge this scaling does not work for m3/m2/hr@50pa.
  2.  
    Thanks for the help Paul, I was hoping you might reply. The figure of 20 is okay for the site in question.
    • CommentAuthorMike George
    • CommentTimeApr 19th 2007 edited
     
    Also thanks Mark, Can you explain a little more? Do you mean the way I have calculated the conversion is incorrect?
    • CommentAuthorGuest
    • CommentTimeApr 20th 2007
     
    Mike,
    I went astray when I read your posting. Sorry if I've caused confusion.
    I can now see the intuative leap that you made 40m3 = 4 times more than B.Regs therefore divide by 4. The thing is that this intuition in unlikely to work when the air permiability target is say 3.5m3/m2/hr@50pa or when the volumes are not quite so nice and round. Having worked your calcs from first principles: -

    If you building had an air leakage of 1ach per hr at 'zero' pa (as your post) then to scale up to 50pa = 1 x 20 = 20ach per hr
    20 x 200m3 = 4000m3 per hr @ 50pa
    4000 / 100sqm = 40m3 per m2 per hr @ 50pa (as you say, however this fails the B.Regs some what)

    However working backwards:-
    100sqm x 10m3 per m2 per hr @50pa = 1000m3/hr
    1000m3 per hr / 200m3 = 5ach per hr @ 50pa
    5ach per hr / 20 = 0.25ach at background pressure

    This agrees with your conclusion.

    Mark
    • CommentAuthorMike George
    • CommentTimeApr 22nd 2007 edited
     
    Thanks Mark, I see where you are coming from now.
    Mike
    • CommentAuthorGuest
    • CommentTimeApr 27th 2007
     
    Paul T,

    I am interested in air permeability so I was looking at these posts. Are the sheltered and exposed figures not given the wrong way round? In that sheltered 1/10 gives a greater ach?

    Regards,

    Steve H